
Physical Education Building Replacement
A New Era for Health, Wellness, and Student Success
Transforming Campus Wellness with Measure P and State Support
91精品 (SBCC) is proud to announce the launch of the Physical Education Building Replacement Project鈥攁n exciting, student-centered development that exemplifies the mission of Measure P: to revitalize and modernize our cherished campus while preserving its excellence for future generations.
Thanks to overwhelming community support, the Measure P bond extension passed with 66% approval in November 2024. This initiative, combined with $34 million in state matching funds, enables SBCC to move forward with one of the most transformative construction projects in its history.
A Vital Resource, Reimagined
Originally constructed in the 1960s, the existing Physical Education building has served SBCC students for decades鈥攂ut time has taken its toll. The new replacement facility is a forward-looking investment in student wellness, athletic achievement, and campus resilience.
Designed in collaboration with , the new building is not just a modern athletic facility鈥攊t鈥檚 a beacon of health and well-being at the heart of SBCC鈥檚 oceanside campus.
Project Highlights
- Location: In the same central area as the existing Physical Education Building on East Cliff Campus.
- Sustainability Focus: Targeting net-zero energy usage, aligning with SBCC鈥檚 commitment to environmental stewardship.
- Flexible Use: Will serve Physical Education, Kinesiology, Athletics, and Health Education programs, in addition to all campus programs, with adaptable instructional spaces.
- Equity & Access: Offers improved accessibility and inclusive design to better support all students, including those in SBCC鈥檚 growing allied health and athletics pathways.
- Student Support Spaces: Includes areas for academic counseling, wellness services, and community events.
- Outdoor Integration: Seamlessly connects with SBCC鈥檚 athletic fields, track, and ocean views鈥攅nhancing the student experience both inside and out.
Timeline
- June 2024 - SBCC Board of Trustees vote on project list with PE Building Replacement Project and matching state funds at the top.
- November 2024 - Measure P Bond Extension passed by 66%.
- April 2025 - SBCC Board of Trustees approve the award of key construction and professional services contracts to move forward with PE Building Replacement Project. Project receives Coastal Commission approval.
- May 2025 - Project receives approval from the California Community College Chancellor's Office Department of Finance.
- June 2025 - Interior (soft) demolition, abatement, and General Mobilization to commence.
- April 2026 - P.E. and Athletics Building Groundbreaking
Thank You, Santa Barbara!
SBCC is deeply grateful to the voters and community members who supported Measure P. Your investment makes it possible for us to build a healthier, more vibrant future for thousands of students who will walk through the doors of this new facility.
Together, we鈥檙e not just constructing buildings鈥攚e鈥檙e shaping opportunities, lifting communities, and championing student success.



